The Warehouse

H&H Plus Women's Curve Sleeveless V Neck Top

  • bvseo_sdk, dw_cartridge, 18.2.0, p_sdk_3.2.0
  • CLOUD, getAggregateRating, 0ms
  • reviews, product
  • bvseo-msg: EXECUTION_TIMEOUT is set to 0 ms; JavaScript-only Display.;
H&H Plus Women's Curve Sleeveless V Neck Top, Red Mid, hi-res H&H Plus Women's Curve Sleeveless V Neck Top, Red Mid, hi-res
Color:


Please select a size
$ 25 00

Product details

Item No: 9401113638271
Refresh your everyday wardrobe with the H&H Women's Sleeveless V Neck Top. Crafted from soft, breathable fabric, it features a flattering V neckline and a sleeveless cut for easy, relaxed wear. Perfect for layering under a jacket or cardigan, or wearing on its own in warmer weather, this versatile top pairs effortlessly with jeans, skirts, or tailored trousers for a polished yet casual look.

Features & Benefits

  • Fabric: 100% viscose
  • Available in sizes 22 - 30
  • Flattering V neckline design
  • Sleeveless cut for ease of movement
  • Care Instructions: Wash before wearing, wash with similar colours, gentle machine wash - cold, do not soak or bleach, line dry in shade, do not tumble dry, cool iron on reverse, dry cleanable